Part of a long term program to recover long term durability of the Hobart Wharf facilities. Severe concrete failure requiring full recovery of strength and durability
Read More
Toll Cool store
The floor was heavily degraded, cracked and chipped leading to slowed movement of fork trucks and the inability to ensure a clean surface when much of the goods are sensitive food product. Very limited time to resurface and the refrigeration could not be cut off
Read More
Self Point Gas Storage
Concrete tank supports all required repair to regain strength and durability. All storage tanks and associated infrastructure required replacement of coatings to meet latest codes for durability
Read More
Red Bridge Campbelltown
This 1838 convict brick built bridge was great for horse and carts, not quite up for B- Double trucks. Substantial strengthening required yet ensuring heritage integrity.
Read More
Launceston Aquatic Centre
Trafficable waterproof membrane to concourse and under tile waterproof membrane to showers and all wet areas
Read More
Cambridge kitchens
Repair and level floor, install food safe heavy duty floor screed
Read More
Kettering Soil anchoring
Stabilisation of embankment and securing of concrete retaining wall to highway
Read More
Hagley Bridge
Repair abutments and strengthen against twist
Read More
Tasman Bridge
The bridge pylons required a long term protection system within the tidal splash zone.
Read More